According to Decision No. 2213/QD-TTg, the inter-reservoir operation procedure on the Ca River basin applies to the following reservoirs: Ban Ve, Nam Non, Khe Bo, Chi Khe, Nam Mo, Ban Ang, Nhan Hac A, Chau Thang, Ban Mong, Ho Ho, and Ngan Truoi.

During the flood season, reservoirs must be operated according to the following principles and order of priority:

1. Ensuring construction safety:

Ensure absolute safety for the Ban Ve and Nam Non structures, preventing the reservoir water level from exceeding the flood control level during any flood event with a recurrence interval of less than or equal to 5,000 years;

Ensure absolute safety for the Khe Bo, Chi Khe, Ban Mong, and Ngan Truoi structures, preventing the reservoir water level from exceeding the flood control level during any flood event with a recurrence interval of less than or equal to 1,000 years;

Ensure absolute safety for the Nam Mo, Ban Ang, Nhan Hac A, Chau Thang, and Ho Ho structures, preventing the reservoir water level from exceeding the flood control level during any flood event with a recurrence interval of less than or equal to 500 years.

2. Contributing to flood reduction in downstream areas;

3. Ensure efficient water supply, power generation, and maintenance of minimum river flow, contributing to water and energy security.

During the dry season, reservoirs ensure the safety of the structures; guarantee water needs downstream; and ensure efficient water supply, power generation, and maintain minimum river flow, contributing to water and energy security.

The operating times for the flood and dry seasons in this Procedure are specified as follows:

Operating hours during the flood season:

- From July 1st to November 30th for the following lakes: Ban Ve, Khe Bo, Chi Khe, Nam Non, Nam Mo, Ban Ang, Ban Mong, Nhan Hac A, and Chau Thang;

- From August 15th to November 30th for the following lakes: Ngan Truoi and Ho Ho.

Dry season operating hours:

- From December 1st to June 30th of the following year for the following reservoirs: Ban Ve, Khe Bo, Chi Khe, Nam Non, Nam Mo, Ban Ang, Ban Mong, Nhan Hac A and Chau Thang;

- From December 1st to August 14th of the following year for the following lakes: Ngan Truoi and Ho Ho.

Operating procedures for interconnected reservoirs in the Srêpốk River basin.

According to Decision No. 2214/QD-TTg, the inter-reservoir operation procedure on the Srêpốk river basin applies to the following reservoirs: Krông Nô 2, Krông Nô 3, Buôn Tua Srah, Chư Pông Krông, Krông Pách Thượng, Krông Búk Hạ, Buôn Kuốp, Hòa Phú, Đrây H'Linh, Srêpôk 3, Srêpôk 4, and the Srêpôk 4A hydroelectric power plant on the Srêpôk river basin.

During the flood season, these structures must be operated according to the following principles and order of priority:

1. Ensuring construction safety:

- Ensure absolute safety for the structures: Buôn Tua Srah, Krông Pách Thượng, Krông Búk Hạ, Buôn Kuốp, Srêpôk 3 and Srêpôk 4, preventing the reservoir water level from exceeding the flood control level during any flood with a recurrence interval of less than or equal to 1,000 years.

- Ensure absolute safety for the Krông Nô 2 and Krông Nô 3 structures, preventing the reservoir water level from exceeding the flood control level during any flood event with a recurrence interval of less than or equal to 500 years.

- Ensure absolute safety for the structures: Chu Pong Krong, Hoa Phu and Dray H'Linh, preventing the reservoir water level from exceeding the flood control level during any flood with a recurrence interval of less than or equal to 200 years.

2. Contributing to flood reduction in downstream areas and avoiding sudden changes in water flow in the border region between Vietnam and Cambodia.

3. Ensure efficient water supply and power generation, maintain minimum river flow, and contribute to ensuring water and energy security.

During the dry season: Ensure the safety of structures; ensure the water needs of downstream areas are met; ensure the efficiency of water supply and power generation; maintain minimum flow levels in the river, contributing to water and energy security.

The operating times for the flood and dry seasons in this Procedure are specified as follows:

Operating hours during the flood season:

- Krông Nô River and the main channel of Srêpốk River: From August 1st to November 30th.

- Krông Ana River: From August 15th to December 15th.

Dry season operating hours:

- Krông Nô River and the main channel of Srêpốk River: From December 1st to July 31st of the following year.

- Krông Ana River: From December 16th to August 14th of the following year.

Operating procedures for interconnected reservoirs in the Huong River basin.

According to Decision No. 2215/QD-TTg, the operating procedure for the interconnected reservoirs in the Huong River basin includes the following reservoirs and dams: Ta Trach, Binh Dien, Huong Dien, A Luoi, A Lin Thuong, the A Lin 3 - A Lin B1, A Lin B2 reservoir cluster, Rao Trang 3, Rao Trang 4, A Roang, Song Bo, Thuong Nhat, Thuong Lo, and Thao Long dam.

During the flood season, the above reservoirs and dams must be operated according to the following principles and order of priority:

1. Ensuring construction safety:

- Ensure absolute safety for the Ta Trach, Binh Dien, Huong Dien, and A Lin 3 reservoirs, preventing reservoir water levels from exceeding the flood control level during any flood event with a recurrence interval of less than or equal to 1,000 years.

- Ensure absolute safety for the A Lưới, A Lin B1, A Lin B2, Rào Trăng 3, Rào Trăng 4, A Roàng, Sông Bồ, Thượng Nhật, and Thượng Lộ reservoir structures, preventing reservoir water levels from exceeding the flood control level during any flood event with a recurrence interval of less than or equal to 500 years.

- Ensure absolute safety for the A Lin Thuong reservoir project, preventing the reservoir water level from exceeding the flood control level during any flood event with a recurrence interval of less than or equal to 200 years;

2. Contributing to flood reduction in downstream areas;

3. Ensure efficient water supply, power generation, and maintenance of minimum river flow, contributing to water and energy security.

During the dry season: Ensure the safety of structures; guarantee water needs downstream; ensure efficient water supply and power generation, and maintain minimum river flow, contributing to water and energy security.

The operating times for the flood and dry seasons in this Procedure are specified as follows:

Flood season operating period: From September 1st to December 31st.

Dry season operating period: From January 1st to August 31st.

Operating procedures for interconnected reservoirs in the Dong Nai River basin.

According to Decision No. 2217/QD-TTg, the operating procedure for the interconnected reservoirs in the Dong Nai River basin includes the following reservoirs: Thac Mo, Can Don, Srok Phu Mieng, Phuoc Hoa, Don Duong, Dai Ninh, Dong Nai 2, Dong Nai 3, Dong Nai 4, Dak R'Tih (upper tier), Dong Nai 5, Tri An, Ham Thuan, Da Mi, Dau Tieng, Da Khai, Da Dang 3, Dak Sin 1, Da M'Bri, Dak Kar, Phu Tan 2, and the Ta Pao diversion dam.

During the flood season, the above reservoirs and dams must be operated according to the following principles and order of priority:

1. Ensuring construction safety:

- Ensure absolute safety for the Dai Ninh reservoir project, preventing the reservoir water level from exceeding the flood control level during all floods smaller than or equal to the peak flood level (PMF) with a peak flow of 11,000 m³ /s;

- Ensure absolute safety for reservoir structures: Dong Nai 2, Dong Nai 3, Dong Nai 4, Tri An and Dau Tieng, preventing reservoir water levels from exceeding flood control levels during any flood event with a recurrence interval of less than or equal to 5,000 years;

- Ensure absolute safety for the Ham Thuan reservoir project, preventing the reservoir water level from exceeding the flood control level during any flood event with a recurrence interval of less than or equal to 2,000 years;

- Ensure absolute safety for reservoir structures: Thac Mo, Can Don, Srok Phu Mieng, Phuoc Hoa, Don Duong, Dak R'Tih (upper level), Dong Nai 5, Da Mi and Da M'Bri, preventing reservoir water levels from exceeding the flood control level or the design flood level for all floods with a recurrence interval of less than or equal to 1,000 years;

- Ensure absolute safety for the reservoir structures: Da Khai, Da Dang 3, Dak Kar, Dak Sin 1, and Phu Tan 2, preventing the reservoir water level from exceeding the flood control level during any flood event with a recurrence interval of less than or equal to 500 years.

2. Contributing to flood reduction in downstream areas;

3. Ensure efficient water supply, power generation, and maintenance of minimum river flow, contributing to water and energy security.

During the dry season: Ensure the safety of structures; guarantee water usage needs, support salinity control downstream and ensure minimum flow in the river; ensure efficient water supply and power generation and contribute to ensuring water and energy security.

The operating times for the flood and dry seasons in this Procedure are specified as follows:

Operating hours during the flood season:

- From July 1st to November 30th for the following reservoirs: Thac Mo, Can Don, Srok Phu Mieng, Phuoc Hoa, Dong Nai 2, Dong Nai 3, Dong Nai 4, Dak R'Tih (upper level), Dong Nai 5, Da Dang 3, Dak Sin 1, Da M'Bri, Dak Kar, Tri An, Ham Thuan, Da Mi, Phu Tan 2, Ta Pao and Dau Tieng dams;

- From August 1st to December 31st for the following reservoirs: Da Khai, Don Duong, and Dai Ninh.

Dry season operating hours: outside the hours specified above.

Operating procedures for interconnected reservoirs in the Ma River basin.

According to Decision No. 2220/QD-TTg, the operating procedure for the interconnected reservoirs in the Ma River basin includes the reservoirs of Hua Na, Dong Van , Cua Dat, Xuan Minh, Trung Son, Thanh Son, Hoi Xuan, Ba Thuoc 1, Ba Thuoc 2, Cam Thuy 1, Canh Tang and the Bai Thuong dam.

During the flood season, the above reservoirs and dams must be operated according to the following principles and order of priority:

1. Ensuring construction safety:

- Ensure absolute safety for the Xuan Minh hydropower plant, preventing the reservoir water level from exceeding the flood control level during any flood event with a recurrence interval of less than or equal to 200 years;

- Ensure absolute safety for the Dong Van, Thanh Son, Hoi Xuan, and Ba Thuoc 1 hydropower plants, preventing the reservoir water level from exceeding the flood control level during any flood event with a recurrence interval of less than or equal to 500 years;

- Ensure absolute safety for the Hua Na, Trung Son, Ba Thuoc 2, Cam Thuy 1, and Canh Tang hydropower plants, preventing reservoir water levels from exceeding flood control levels during any flood event with a recurrence interval of less than or equal to 1,000 years;

- Ensure absolute safety for the Cua Dat reservoir project, preventing the reservoir water level from exceeding the flood control level during any flood event with a recurrence interval of less than or equal to 10,000 years.

2. Ensuring flood safety for downstream areas:

- Ensure that the water level of the Chu River at Xuan Khanh does not exceed 13.71 m during any flood event with a recurrence interval of less than or equal to 166 years (frequency of 0.6%);

- Ensure that the water level of the Ma River at Ly Nhan does not exceed 13.0 m during all floods with a recurrence interval of less than or equal to 50 years;

- Contributes to reducing flooding in the downstream area of ​​the Buoi River.

3. Ensure efficient water supply, power generation, and maintenance of minimum river flow, contributing to water and energy security.

During the dry season: Ensure the safety of structures; guarantee water needs downstream; ensure efficient water supply and power generation, and maintain minimum river flow, contributing to water and energy security.

The operating times for the flood and dry seasons in this Procedure are specified as follows:

Operating hours during the flood season:

- From July 1st to November 30th for the following reservoirs: Hua Na, Dong Van, Cua Dat, Xuan Minh, and Bai Thuong dam;

- From July 15th to November 15th for the following reservoirs: Trung Son, Thanh Son, Hoi Xuan, Ba Thuoc 1, Ba Thuoc 2, and Cam Thuy 1;

- From June 1st to October 31st for Canh Tang Lake.

Dry season operating hours:

- From December 1st to June 30th of the following year for the following reservoirs: Hua Na, Dong Van, Cua Dat, Xuan Minh and Bai Thuong dam;

- From November 16th to July 14th of the following year for the following reservoirs: Trung Son, Thanh Son, Hoi Xuan, Ba Thuoc 1, Ba Thuoc 2, and Cam Thuy 1;

- From November 1st to May 31st of the following year for Canh Tang Lake.