Festival Logo
  • HOME
  • NEWS
  • SCHEDULE
Festival Logo
Home/News/Lao Cai invests 175 billion VND to renovate 20.4 km of Van Chan - Tram Tau road.
Economy

Lao Cai invests 175 billion VND to renovate 20.4 km of Van Chan - Tram Tau road.

The People's Committee of Lao Cai province has just approved a project to renovate and repair 20.4 km of the Van Chan - Tram Tau road (DT.174), with a total investment of 175 billion VND, aiming to address the deterioration, ensure traffic safety, and enhance regional connectivity.

Báo Pháp Luật Việt NamBáo Pháp Luật Việt Nam25/11/2026

The People's Committee of Lao Cai province has just issued Decision No. 4361/QD-UBND approving the project to renovate and repair the roadbed and surface of Van Chan - Tram Tau (DT.174), section from Km11+00 to Km31+400.

The project is being implemented in Cau Thia ward, Tram Tau commune and Hanh Phuc commune, with a total length of approximately 20.4 km.

This project belongs to group B, a level IV transportation project, and is designed according to the standards of a level V mountain road.

Many sections of Provincial Road 174 from Van Chan to Tram Tau were damaged due to heavy rain and landslides. (Photo taken in 2021 - Lao Cai Provincial Electronic Information Portal).
Many sections of Provincial Road 174 from Van Chan to Tram Tau were damaged due to heavy rain and landslides. (Photo taken in 2021 - Lao Cai Provincial Electronic Information Portal).

According to the approved plan, the road will essentially retain its existing alignment, utilizing the old roadbed and surface to minimize land acquisition and impact on structures along the road.

The road base is 6.5 m wide, and the road surface is 3.5 m wide; in some locations with favorable conditions, the road surface can be widened to 5.5 m.

The main items include roadbed improvement, asphalt concrete paving on a crushed stone base; repair and supplementation of drainage ditches and culverts; and reinforcement of landslide-prone and landslide-prone areas with gabion retaining walls.

The traffic signaling and safety systems have also been completed, and power lines have been moved outside the construction area.

The investment aims to address the deterioration of the road, improve its operational capacity, ensure safe and smooth traffic flow, and enhance connectivity with National Highway 32 and National Highway 37.

This will meet the needs for travel and transportation, contributing to the promotion of socio-economic development, tourism, and ensuring national defense and security in the locality.

The total investment for the project is 175 billion VND, sourced from the central government budget and the provincial budget.

The Project Management Board for Investment and Construction No. 1 of Lao Cai province is assigned as the investor, responsible for organizing the implementation, managing quality, quantity, progress, and costs according to regulations.

The People's Committee of Cau Thia ward and the People's Committees of Tram Tau and Hanh Phuc communes are responsible for coordinating the handover of land, land management, construction order, and creating conditions for the project to be implemented on schedule.

RELATED ARTICLES

View all→
The US is about to announce new tariffs on 16 major trading partners.
25/11/2026

The US is about to announce new tariffs on 16 major trading partners.

The EU loses more than 200 billion euros in tax revenue each year.
25/11/2026

The EU loses more than 200 billion euros in tax revenue each year.

The consumer landscape in Ho Chi Minh City is improving.
25/11/2026

The consumer landscape in Ho Chi Minh City is improving.

Festival Logo
  • THE MINISTRY OF CULTURE, SPORTS AND TOURISM
  • Số 51 phố Ngô Quyền, phường Cửa Nam, thành phố Hà Nội.

Categories

  • HOME
  • NEWS
  • SCHEDULE

Connect with us

Powered by Techcity